This movie requires Flash Player 9
 
  • HOME
  • ABOUT ALLIANCE
    • MISSION STATEMENT
    • COMPANY SIZE
    • INDUSTRY RANKING
    • REPRESENTATIVE CLIENTS
    • COMMUNITIES SERVED
    • INDUSTRIES SERVED
    • PERFORMANCE CHALLENGES
    • PROFESSIONAL RESOURCES
    • AWARDS AND HONORS
    • A BRIEF HISTORY
    • COMPANY ACHIEVEMENTS
  • PROFESSIONAL SERVICES
    • SCOPE OF ALLIANCE SERVICES
    • MUNICIPAL CONTRACT OPERATIONS
    • WATER AND WASTEWATER DISTRICT MANAGEMENT AND OPERATIONS
    • INDUSTRIAL OPERATIONS AND MAINTENANCE
    • PUBLIC WORKS
    • PROJECT MANAGEMENT
  • PROJECT PROFILES
    • ADVANTAGES
    • SUCCESS STORIES
    • SITE LOCATIONS MAP
  • INFO BRIEFINGS
  • RELEVANT LINKS
  • CAREER OPPORTUNITIES
  • CONTACT US
  • COMPANY WEBSTORE

Buchanan County, MO

1:
INITIAL OPERATIONS CHALLENGES

2: PROJECT
BACKGROUND

3: ALLIANCE
ACHIEVEMENTS

1: Initial Operations Challenges


  • The Buchanan #1 Water District was still
    reeling from a series of Board meetings filled with irate
    customers due to an increase in their water rates that had
    been unavoidable after Missouri American, their water supplier,
    more than doubled the rates they were charging. Long and
    heated Board meetings were becoming common.
  • Because of prior accidents and incidents
    with the District, the Board was finding it difficult to
    obtain insurance coverage that is essential for any water
    district.
  • One of the initial challenges was
    the start up and prove out of a $96,000 pumping station
    that had been installed three years prior to Alliance coming
    on line, but never put into service.
  • The water distribution system had
    some antiquated controls and very limited
    means to monitor tower
    levels and system pressures. As a result the one and only
    field mechanic was required to monitor the
    pump house
    seven
    days a week and was unable to take time off.

2: Project Background

The Buchanan water district purchases its
water wholesale and distributes it on a wholesale basis to
the City of DeKalb and on a retail basis to the residence
of Rushville, Sugar Lake, Bean Lake, Winthrop, Lake Contrary,
Halls and surrounding rural areas.

In addition to a complete range of operation
and maintenance services, Alliance provides Buchanan County
District #1 with a variety of administrative services, including
meter reading, computerized billing, collection, financial
reporting, and day-to-day management of the utility.

3: Alliance
Achievements

  • Since Alliance came on, numerous water system
    improvements have occurred. These include: the start up
    and prove out of the District’s existing pump station,
    upgrading old systems controls with new radio telemetry
    SCADA (Supervisory Control And Data Acquisition) equipment,
    the implementation of a meter change out program to increase
    revenues, the hiring of an additional employee in the field
    to reduce overtime and reduce the opportunity of jeopardizing
    the integrity of the water system, and the construction
    of a garage for vehicle and maintenance needs.
  • Alliance has helped the District upgrade
    its filing system, improve delinquent collections and get
    a professional handle on its business operations and financial
    status.
  • Alliance has implemented numerous operational
    and maintenance procedures to effectively guide day-to-day
    operations to accommodate future growth and system improvements.
  • Increased revenues through meter change out
    are beginning to be noticed as well as a reduction in water
    loss due to leak detection and repair efforts.
  • Wholesale contract negotiations with the City of DeKalb were going badly, with negative feelings on both sides. Using lessons learned from assisting many clients through the negotiation process, Alliance was able to help the two communities come to an amicable agreement.
  • Alliance closed out the DistrictÕs abandoned wells according to DNR specifications. Proper well abandonment is essential to avoid legal, liability and regulatory issues.
  • Alliance was instrumental in joining and formation of the Northwest Missouri Wholesale Water Commission. Eight regional member communities are working together to build a wholesale water supply system that will assure adequate quality and quantity of water for the foreseeable future.
  • Ageing infrastructure is resulting in water waste and other problems for the District. Alliance has identified the exact cause and location of the waste issue and is in the process of seeking funding to replace a stretch of faulty water main. Once the problem is fixed, the District should save $20,500 each year.